Configurable test items
Create clear associations among test tasks, parameters, and execution scripts while reducing repetitive setup.
ROBOTICS TEST AUTOMATION
User permissions, test-item configuration, script execution, device parameters, and operating results are integrated into one software platform around the joint module test workflow.
PROJECT CONTEXT
Robot joint module testing spans the device under test, instruments, communication interfaces, test items, and operator permissions. The platform organizes these elements into a structured software workflow.
Account management, test configuration, script execution, and equipment parameters are presented in a consistent environment for preparing tasks, running tests, and reviewing system state.
Create clear associations among test tasks, parameters, and execution scripts while reducing repetitive setup.
Connect the joint module and associated equipment so control, communication, and status acquisition operate in one process.
Use account and permission controls to define operating boundaries and provide clear entry points for test execution.
People, configuration, scripts, and equipment state are connected in one executable path.
Assign user roles and operating permissions to manage access boundaries.
Select test items, parameter conditions, and the associated execution scripts.
Confirm the joint module, communication interface, and test equipment state.
Run test scripts and review process information and device parameters in the interface.
Reduce switching among tools by bringing preparation and execution into one platform.
Organize test tasks through configuration and scripts with a clear structure for future expansion.
Present key parameters and operating information for faster on-site assessment.
Core software views are shown alongside the joint module and its on-site connections.






Start with installed equipment, critical criteria, or an engineering workflow that still needs definition.